Built for the homeowner.

The room you actually want. At the price it should cost.

Instantly find your design style, get the exact material list, and know whether your contractor's labor invoice is a rip-off.

You're on the list. We'll email you the day it opens.

Free to browse · No sales calls · Founding members get discounts for life

A real quote we checked · Primary bath · Sacramento, CA

They're charging you $2,810 too much.

Demo and haul away
Typical here: $1,300 – $1,600
$2,400
Way high
Tile install, 180 sf
Typical here: $2,400 – $2,900
$3,960
High
Plumbing rough-in
Typical here: $1,900 – $2,300
$2,800
High
Waterproofing
Right in range
$780
Fair
Set vanity and fixtures
Right in range
$640
Fair

Every item. Named, priced, yours.

Not something like it. The actual tile, the actual tub, the actual grout color. Hover any room.

Moss & OakGlazed green wall tile4x8 · $12.40/sfGrout colorCharcoal, sandedBrass shower systemThermostaticFreestanding tub67in stone resinFloor-mount fillerBrushed brassWhite oak panelRift sawnFloor tile24x48 matte
Moss & Oak23 items · all named, all pricedSee the list
Rift Oak KitchenLit wine wallMetal peg systemFloating oak shelvesIntegrated LEDRift oak cabinetryFull-height pantryBrass bar pulls8in unlacqueredQuartz countertop3cm eased edgeOak plank floor7in matte
Rift Oak Kitchen41 items · all named, all pricedSee the list
Plaster & WalnutLimewash plasterWarm clayArched sconcesOpal glassFluted glass cabinetBrass frameMarble topHoned 2cmWalnut vanity72in doubleLeather stoolBrass band
Plaster & Walnut26 items · all named, all pricedSee the list

Send us a real invoice. We'll tell you if it's a rip-off.

Free, before we even launch. We pick a batch every week, go through it line by line against what that work costs in your zip code, and email you back what we find. No sales call, no obligation, nothing to cancel.

Usually back within 3 days

Got it. We'll email you at that address with what we find.

We use what we learn from real invoices to sharpen the pricing data behind remder, always stripped of your name and address. We never share your invoice with a contractor, and we never sell your information.

This is the whole thing.

Click anything in the sidebar. Three of these are free forever. The rest come with membership while your project is happening.

We already know what you like

Connect Pinterest and add the photos on your phone. Two years of saving, four different apps, and nobody ever told you what any of it was.

Free

Reading 214 saves

Pinterest · 3 boards · 187 pins
Camera roll · 27 photos

Your style

Warm minimal · matte finishes · reeded wood · unlacquered brass

Every material, at our cost

Down to the grout color. Ordered through us at the price we pay. Showrooms and contractors add 20 to 35 percent and never itemize it.

Free

Primary bath · 23 items

Aegean Oat porcelain
Floor + shower walls, 180 sf
$2,640$1,840
Willow reeded ceramic
Tub wall, 34 sf
$960$690
Walnut fluted vanity
60in, ships Aug 12
$3,100$2,240
Brushed brass fixtures
Tub, shower, sink
$920$615
Grout, charcoal sanded
3 bags + sealer
$96$71

Every dollar, as it goes out

Materials, labor, permits, the dumpster, the thing nobody planned for. Add anything you want to track.

Free

Primary bath

Spent so far$8,240 of $13,000
Materials$5,456
Labor, paid to date$2,400
Permit$384
Left to spend$4,760

We keep watching the prices after you buy

Save anything on your list and we watch it, from whatever brand actually fits your room. Not our products, the right ones. Your phone tells you when one drops.

Member
Your vanity dropped $60 today.
Now $2,180 · lowest in 60 days · order now
Brass shower system dropped $84
Now $531 · sale ends Sunday
Reeded ceramic back in stock
Same price · 6 week lead time cleared

Watching 23 items · saved you $312 so far

Your actual room. Not a lookalike.

Upload a photo of your real bathroom and we render the materials you just bought right into it. Same window, same wall, same weird corner.

Member

Your room · rendered in your materials

Your photo

Your materials in it

Rendered in 40 seconds, then checked by a person before it reaches you.

Every decision, before it stops the job

Hundreds of calls in a bathroom, and you normally find out about each one the morning it holds everything up. Plus the twelve questions that decide what you actually pay.

Member

Decisions · 4 of 31 done

Which direction the tile runs
Grout color, width, sanded or not
Niche height, size, and which stud bay it fits
Vanity height, and whether the drawers clear the trap
Where every outlet, switch and light goes
Shower valve height, before the wall closes

Ask them before you sign · 12 questions

?Are demo, dumpster and disposal separate lines or one?
?Is the permit in this number, or billed to me later?
?What's your change order rate, and what triggers one?
?What happens to the price if I supply all the materials?
?Who is actually on site every day, you or a sub?
?What's the deposit, and exactly what does it cover?
?Is waterproofing in the tile line or its own line?
?Is the payment schedule tied to dates or completed work?
?How many days from demo to done, and what pauses the clock?
?Who pays if a material arrives damaged or back-ordered?
?Is there a warranty on the labor, and for how long?
?What happens to the price if you open the wall and find rot?

We read the quote so you don't have to guess

Line by line against what that work actually costs in your zip code. We make nothing on labor, so there's no reason for us to be nice about it.

Member

Labor quote · 3 of 7 flagged

Demo and haul away
Typical here: $1,300 – $1,600
$2,400
Way high
Tile install, 180 sf
Typical here: $2,400 – $2,900
$3,960
High
Plumbing rough-in
Typical here: $1,900 – $2,300
$2,800
High
Waterproofing
Right in range
$780
Fair
"Can you break out demo, dumpster and disposal as separate lines, and confirm whether the permit is in the rough-in number? I'd like to see them before I sign."
Copy message

A designer who has stood in a hundred gutted bathrooms

Not a decorator. Someone who knows what the answer does to the framing, the plumbing and the schedule. Text them at 11pm the night before tile goes in.

Member
Dana · your designer
Online
YESTERDAY
Which direction should this tile run? They're asking me right now
10:58 PM
Long way, toward the window. Room reads wider and you get fewer cuts at the drain.
11:02 PM
TODAY
They're saying the vanity won't fit with the door swing
7:41 AM
It fits. You have 4in of clearance. Send me a photo of where they're standing the door and I'll mark it up.
7:43 AM
IMG_4821 · from your camera roll
7:49 AM
Okay, I see it. Two ways to go and they both work. Tap one and I'll update your list.
Keep the 60in vanityMove the door swing out. No cost change.✓ My pick
Drop to 54inDoor stays. Saves $310 and 3in of counter.
7:52 AM

Every month earns your next room

Membership stacks credit toward your next design. Watch it build, then spend it on the kitchen once the bathroom is finally done.

Member

Your rewards

$297credit earned · 3 months

$202 from a free kitchen list

Aug membership+$99
Jul membership+$99
Jun membership+$99

Rooms nobody else gets to see

New drops every month, built around what is actually trending right now instead of what a showroom has sitting in the back. They never hit the public studio.

Member

August drop · 8 rooms · members only

Trending

Zellige Revival

Bath · handmade glaze

New drop

Warm Minimal Kitchen

Kitchen · plaster + oak

Members

Quiet Stone

Bath · full slab walls

Members

Burl & Brass

Powder · high gloss

Next drop in 11 days

The lowdown

The stuff a designer knows and nobody writes down. Short, specific, and written for the week you actually need it.

Member

This week

Grout lowdown

Why the grout color matters more than the tile

Pick it wrong and a $12 a foot tile reads like a $2 one. 3 min read

Hot right now

Reeded everything, and how not to date your bathroom

Where it works, where it will look like 2026 forever. 4 min read

Materials

Unlacquered brass in year three

What it actually looks like after real use, with photos. 3 min read

Best practice

Niche height: the 48in rule and when to break it

And why your contractor keeps defaulting to 42. 2 min read

Best practice

The 10% overage rule, and why the tile guy wants 15

Who is right depends entirely on your pattern. 3 min read

Start with what you've already saved.

Connect your boards, add the photos on your phone, and we'll tell you what your style actually is. Free, and it takes about a minute.

We never post anything, and we never sell your data.

Every app in this business is built for somebody else.

The contractor or the material vendor. That's the whole industry. remder is the only one built around the homeowner, protecting your pockets. Think about who is paying each of these.

HouzzContractors · monthly software and lead ads
WayfairMaterial vendors · margin on every item
Home Depot & Lowe'sContractors and material vendors · they are the vendor
PinterestAdvertisers · brands paying to be in front of you
remderYou. That's the entire list.

We get paid when you sign up and keep using it. So the only way we win is by being right about your house and helping you save money on materials and labor. The more people who use it, the sharper it gets.

We're not here to make friends with the industry. We're here to change it.

Questions.

How do you make money if you don't mark up materials?

The room list and the membership. If a brand wants to give us an affiliate link we'll take it, but that is not how we make our money and it never decides what ends up in your room. We are directing homeowners toward their own style, not toward brands begging us to bring you there. We want to build your home, not a home you got sold into because somebody else was getting a good deal.

Is the room designed for my exact space?

The list is the full specification for a designed room, matched to your style. Members get it rendered into a photo of their own room, with quantities worked out for their measurements.

Do I have to use your contractor?

We don't have one. Use whoever you already trust. Send us their labor quote and we'll tell you whether the number is fair. We'll also arm you with the questions to ask before you pay anything and during the build, so the work gets done right, the way you wanted it, at a price that makes sense.

Where does your labor pricing come from?

Published construction cost data adjusted for your area, our own project history, and the quotes members send in. We give you the range and the question to ask, not a verdict.

What if I just want the ideas?

Browsing is free forever. You only pay when you want the actual list.

Get in before everyone else.

We'll email you the day it opens. That's the only thing we'll ever send.

Join the waitlist